-
Posts
5,399 -
Joined
-
Last visited
-
Days Won
2
Content Type
Profiles
Forums
Gallery
Downloads
Store
Everything posted by Fates
-
Had an incredible time on vacation a weekend ago, and thought I'd share a couple pics. I was in a rustic cabin about 15 miles from anywhere. IF anyone ever gets a chance to stay Wilderness State Park, Station Point, you will enjoy the solitude and long to come back every year. I plan to be back very soon....plus, for $60 a night, it's gotta be the 8th wonder of the world. Getaway Cabin,Very Rustic, but worth every minute of the Solitude it offered.
-
Arma_Euro104Update105.zip View File Armed Assault European Update 1.05 Patch Submitter Fates Submitted 03/03/2007 Category Patches
-
Arma_InternationalUpdate105.zip View File Armed Assault International Patch 1.05 Submitter Fates Submitted 03/03/2007 Category Patches
-
Had this stop buy yesterday and give rides. Unfortunately, I did not win, but I got some great shots.
-
99,999 Bottles of Beer on the wall......99,999 Bottles of Beer!
-
So Scared....I just shit a Rope!
-
I'm hearing he passed away in Tampa? http://www.washingtonpost.com/politics/ap-source-retired-gen-norman-schwarzkopf-has-died-in-tampa-fla/2012/12/27/ec648c10-5083-11e2-835b-02f92c0daa43_story.html
-
Very Nice!
-
I've actually owned one from each of those groups.
-
Paint when from Blue to Black and bottom coat was dropped down quite a bit. The rest just needed to be painted as it was 10 years old. The huge makeover was do. These aircraft experience a HUGE inspection every ten years and paint and interior usually follow, along with some serious avionics upgrades to prepare the aircraft for WAAS/LPV, Fan1A, CPDLC, etc
-
Not a repo. Customers aircraft. We have another one coming in just a few weeks, and another 2 months after that. Back to back big jobs.
-
We just finished a Major Inspection on this Global Express. The aircraft was completely gutted, a structural inspection done for corrosion, along with thousands of hours of maintenance, modification, alteration, gear overhaul, paint, refurb, you name it. The Project took 4 months from start to finish and we were glad to see it leave today, squawk free and on time. Arrival Gutting Double Engine Change (to give you some scale, this engine is about the size of an F150 Pickup) Paint Stripping Wheels Up Delivery
-
The December Calendars are available Please head over and enjoy! http://combatace.com...tace-calendars/
