Jump to content
Sign in to follow this  
krgf15

ANY F-15 CREW CHIEFS HERE?

Recommended Posts

Just Wondering, Ive been active duty F-15 for 9+ years now, I see alot of guard guys on here, but havent seen any active duty.

Share this post


Link to post
Share on other sites

not I. I was the ammo guy who supplied the F-16's at Cannon with fresh inert 20mm and little blue bombs (BDU-33's) all the time.

Share this post


Link to post
Share on other sites

I was an MTL at the 362nd at Sheppard AFB for the Crew Dawgs from 2001 to 2005.

Share this post


Link to post
Share on other sites

ANG F-16C+ Crew Chief (and ex AD F-4E/G Crew Chief). Never worked 15s but had to study them for my 7 level. :wink:

Share this post


Link to post
Share on other sites

i am going to F-16's in July. They just opened 7 levels up for other fighters last year, and now I have orders.

I am going to block 30 16s

Share this post


Link to post
Share on other sites

Cool. We're "upgrading" our ANG block 25s to block 30s by the end of the year. Most of our 25s are heading to the boneyard, but 5 or 6 have been through "Falcon Star" structural upgrades so they'll go to the Deluth, MN ANG. We'll be getting 30s from Syracuse and maybe Selfridge.

 

After working 15s you're probably going to like 16s. :yes: I went from maintenance hog F-4Es to F-16s in the early 90s and it was like night and day (what do you mean I have time for lunch???). :biggrin:

Share this post


Link to post
Share on other sites

Thats the kind of stuff I like to hear, but I do know that your engine change is alot harder than ours

Share this post


Link to post
Share on other sites
Thats the kind of stuff I like to hear, but I do know that your engine change is alot harder than ours

 

Really? After engine pull, engine bay wash, inspection, 7 level inspection, and QVI (all thing lining up perfectly) we can have an engine in and out during one shift...and possibly have the runs done and an FMC jet. Most of the time things don't line up perfectly so it takes two shifts from engine pull to FMC.

Share this post


Link to post
Share on other sites
Really? After engine pull, engine bay wash, inspection, 7 level inspection, and QVI (all thing lining up perfectly) we can have an engine in and out during one shift...and possibly have the runs done and an FMC jet. Most of the time things don't line up perfectly so it takes two shifts from engine pull to FMC.

 

If we have a crew of 4 that know what they are doing, (2 to do the work and 4 for the roll out, I think you guys have to ratchet it out right? we just have to push it.) We can have it out in under an hour, and about an hour for the bay, and if QA is quick, another half hour, and then like you said, if everything lines up, about 30 min to an hour. This all depends if you have the trailers handy, and if you have to transfer the moter from the 4000 to the 3000

Share this post


Link to post
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
Sign in to follow this  

×

Important Information

By using this site, you agree to our Terms of Use, Privacy Policy, and We have placed cookies on your device to help make this website better. You can adjust your cookie settings, otherwise we'll assume you're okay to continue..